About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

Twelve children take sixteen days to complete a work which can be completed by eight adults in twelve days. Sixteen adults started working and after three days, ten adults left and four children joined them. How many days will they take to complete the remaining work?

  • A3 days
  • B5 days
  • C6 days
  • D9 days
Show answerHide answer

Correct answer C

Work done by 12 children in 16 days = 1 (full work) Work done by 1 child in 16 days = 1/12 Work done by 1 child in 1 day = 1/(12 × 16) = 1/192 Work done by 8 adults in 12 days = 1 Work done by 1 adult in 12 days = 1/8 Work done by 1 adult in 1 day = 1/(8 × 12) = 1/96 Work done by 16 adults in 3 days = 16 × 3 × (1/96) = 1/2 Remaining work = 1 - 1/2 = 1/2 Now, 6 adults and 4 children work together: Work done by 6 adults in 1 day = 6 × 1/96 = 6/96 = 1/16 Work done by 4 children in 1 day = 4 × 1/192 = 4/192 = 1/48 Total work done per day = (1/16 + 1/48) = (3 + 1)/48 = 4/48 = 1/12 Days required = (1/2) ÷ (1/12) = 6 days.

4 + 5 - 3 = _____?

  • A6
  • B5
  • C7
  • D4
Show answerHide answer

Correct answer A

4 + 5 - 3 = 6. First, add 4 and 5 to get 9, then subtract 3 to get 6.

Which is not a binary code?

  • A001
  • B0101
  • C011
  • D0210
Show answerHide answer

Correct answer D

The code "0210" is not a binary code because it contains the digit "2," which is not valid in the binary number system. Binary code strictly uses only the digits 0 and 1. Each digit in a binary number is called a bit.

Have a useful question? Submit an MCQ