About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

If slope of AB = slope of BC, then A, B, C are?

  • AParallel
  • BPerpendicular
  • CCollinear
  • DNone of these
Show answerHide answer

Correct answer C

Equal slopes mean the points lie on the same straight line. If AB and BC have the same slope, they form one continuous line. Therefore, A, B, and Care collinear.

If the ratio is 2:3 = x:12, what is the value of x?

  • A7
  • B8
  • C9
  • DNone of these
Show answerHide answer

Correct answer B

To solve for x, we can set up a proportion based on the given ratio: 2/3 = x/12 We can then cross-multiply: 2 × 12 = 3 × x 24 = 3x Next, we can divide both sides by 3: x = 24 ÷ 3 x = 8 So, the value of x is 8.

Which is the additive inverse of -3/a?

  • A3/a
  • B3/a
  • C-3/a
  • DNone of these
Show answerHide answer

Correct answer B

The additive inverse of a number is the number that, when added to it, results in zero. For -3/a, the additive inverse is: 3/a, since (-3/a) + (3/a) = 0.

A man faces North and covers 7 kilometers, turns west and covers 2 kilometers then turns South and covers 4 kilometers and turns West again and covers 2 kilometers. How far is he from the starting?

  • A4 kilometers
  • B5 kilometers
  • C7 kilometers
  • DNone of above
Show answerHide answer

Correct answer B

. Starts facing North, moves 7 km North. 2. Turns West, moves 2 km. 3. Turns South, moves 4 km → Now he's (7 - 4) = 3 km North from start. 4. Turns West again, moves another 2 km → Total 4 km West. So, from the starting point, he's 3 km North and 4 km West. Use Pythagoras theorem to find the distance from the start: Distance = √(3² + 4²) = √(9 + 16) = √25 = 5 km.

Maria bought a laptop at 20% discount on its original price. She sold it with a 40% increase on the price she bought. Her percentage of profit on the original price is?

  • A20%
  • B28%
  • C12%
  • DNone of these
Show answerHide answer

Correct answer A

Let's assume the original price is $100. Maria bought it at 20% discount: $100 - 20% = $80 She sold it with a 40% increase: $80 + 40% = $112 Profit = Selling price - Original price = $112 - $100 = $12 Percentage profit = (Profit / Original price) x 100 = ($12 / $100) x 100 = 12% The correct answer is 12%.

A soap factory makes 600 units in 9 days with help of 20 machines. How many units can be made in 12 days with the help of 18 machines?

  • A680
  • B720
  • C760
  • D610
Show answerHide answer

Correct answer B

600 units are made in 9 days with 20 machines. To find the number of units made per day, divide 600 by 9: 600 ÷ 9 = 66.67 units per day. Since there are 20 machines, the number of units made per day per machine is: 66.67 ÷ 20 = 3.33 units per day per machine. Now, if we have 18 machines and want to produce units for 12 days, the total units that can be made are: 3.33 units per day per machine × 18 machines × 12 days = 720 units. So, with 18 machines, the soap factory can produce 720 units in 12 days.

Have a useful question? Submit an MCQ