About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

A and B together can complete a work in 3 days. They start together but after 2 days, B left the work. If the work is completed after two more days, B alone could do the work in ____?

  • A5 days
  • B9 days
  • C6 days
  • DNone of these
Show answerHide answer

Correct answer C

A and B together can complete the work in 3 days, so their combined rate of work is 1/3 per day. They work together for 2 days, so they complete 2/3 of the work. B leaves, and A completes the remaining 1/3 of the work in 2 days. This means A's rate of work is 1/6 per day (since A completes 1/3 of the work in 2 days). Now, we know B's rate of work is the difference between their combined rate and A's rate: (1/3 - 1/6) = 1/6 per day. Since B can complete the entire work in x days, B's rate of work is also 1/x per day. Equating the two expressions for B's rate of work, we get: 1/6 = 1/x --> x = 6 So, B alone can complete the work in 6 days.

The expression 5x² + 2x + 1 is a ____?

  • AQuadratic and binomial
  • BCubic and trinomial
  • CQuadratic and trinomial
  • DNone of these
Show answerHide answer

Correct answer C

Highest power of x is 2 → it is a quadratic expression. It has three terms ( 5x², 2x, 1 ) → a trinomial.

What is 30% of 50?

  • A10
  • B15
  • C20
  • D25
Show answerHide answer

Correct answer B

30% of 50 is calculated by multiplying 50 by 30/100, which equals 15.

The Differential Equation formed by y = across + bsinx + 4, where a and b are arbitrary constant is?

  • AD²y/dx² + y = 4
  • BD²y/dx² + y = 0
  • CD²y/dx - y = 0
  • DNone of these
Show answerHide answer

Correct answer A

Given y = acos(x) + bsin(x) + 4 First derivative: dy/dx = -asin(x) + bcos(x) Second derivative: d²y/dx² = -acos(x) - bsin(x) Notice that d²y/dx² = -(acos(x) + bsin(x)) Given y = acos(x) + bsin(x) + 4, we rearrange to find acos(x) + bsin(x) = y - 4 Substituting into the second derivative equation gives: d²y/dx² = -(y - 4) d²y/dx² = -y + 4 d²y/dx² + y = 4 The answer is d²y/dx² + y = 4.

Have a useful question? Submit an MCQ