Complete the series 1, 9, 25, 49, 81,?
Show answer
Correct answer B
The correct answer to 'Complete the series 1, 9, 25, 49, 81,' is 121.
Learn Smarter. Achieve More.
Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.
Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.
Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.
7247 matching questions
Correct answer B
The correct answer to 'Complete the series 1, 9, 25, 49, 81,' is 121.
Correct answer B
The domain of a relation is the set of all first elements in the ordered pairs. For the relation R: The first elements are 4, 5, and 6 So, the domain of 𝑅 is {4,5,6}.
Correct answer C
A and B together can complete the work in 3 days, so their combined rate of work is 1/3 per day. They work together for 2 days, so they complete 2/3 of the work. B leaves, and A completes the remaining 1/3 of the work in 2 days. This means A's rate of work is 1/6 per day (since A completes 1/3 of the work in 2 days). Now, we know B's rate of work is the difference between their combined rate and A's rate: (1/3 - 1/6) = 1/6 per day. Since B can complete the entire work in x days, B's rate of work is also 1/x per day. Equating the two expressions for B's rate of work, we get: 1/6 = 1/x --> x = 6 So, B alone can complete the work in 6 days.
Correct answer C
Highest power of x is 2 → it is a quadratic expression. It has three terms ( 5x², 2x, 1 ) → a trinomial.
Correct answer C
The perimeter formula for a rectangle is 2(Length + Width) = Perimeter. Substituting values: 2(L + 22) = 100 → L + 22 = 50 → L = 28 cm.
Correct answer B
30% of 50 is calculated by multiplying 50 by 30/100, which equals 15.
Correct answer A
Given y = acos(x) + bsin(x) + 4 First derivative: dy/dx = -asin(x) + bcos(x) Second derivative: d²y/dx² = -acos(x) - bsin(x) Notice that d²y/dx² = -(acos(x) + bsin(x)) Given y = acos(x) + bsin(x) + 4, we rearrange to find acos(x) + bsin(x) = y - 4 Substituting into the second derivative equation gives: d²y/dx² = -(y - 4) d²y/dx² = -y + 4 d²y/dx² + y = 4 The answer is d²y/dx² + y = 4.
Correct answer D
Area of the first carpet = 8m (3m) = 24 square meters area of the second carpet = 12m (6m) = 72 sq.m if the cost of 24 sqm carpet = 6288 cost of 72sqm =? cost = 72 (6288/24) = 3 (6288) = Rs 18864.
Correct answer C
To find the third number: The average of three numbers is 20. Therefore, the sum of these three numbers is 20×3=60. The sum of the two given numbers (16 and 22) is 16+22=38. Subtract this sum from the total sum to find the third number: 60−38=22. So, the third number is 22.
Correct answer B
Let width = w, length = 4w Perimeter = 2(length + width) 80 = 2(4w + w) 80 = 10w w = 8 length = 4w = 32m, width = 8m.