About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

Point out the odd one: 6, 9, 15, 21, 24, 28, 30?

  • A24
  • B21
  • C28
  • DNone of these
Show answerHide answer

Correct answer A

- Looking at the series, we can see that the numbers are increasing with some common differences between them. - The pattern is as follows: - 6 + 3 = 9 - 9 + 6 = 15 - 15 + 6 = 21 - 21 + 3 = 24 - 24 + 4 = 28 - 28 + 2 = 30 By observing the pattern, we can see that all numbers follow an increment by either 3 or 6, except for 24, which increases by 4 instead of 3 or 6. Therefore, the o dd man out i n the series is 24.

Which of the following statements is true about the type-II error?

  • AType-II error means to accept an incorrect hypothesis
  • BType-II error means to reject an incorrect hypothesis
  • CType-II error means to accept a correct hypothesis
  • DType-II error means to reject a correct hypothesis
Show answerHide answer

Correct answer A

A Type-II error means accepting an incorrect hypothesis (or failing to reject a false null hypothesis). This means that the test or experiment has failed to detect a significant effect or difference when it actually exists.

77: 84:: 121:?

  • A1190
  • B1199
  • C1099
  • D3190
Show answerHide answer

Correct answer A

The correct answer to '77: 84:: 121:' is 1190.

A group of friends decides to share 4 pizzas equally if 6 persons in the group and each pizza has 8 slices then number of slices per person will be?

  • A2
  • B4
  • C5
  • D6
Show answerHide answer

Correct answer C

Number of pizzas = 4 pizzas The number of slices in each pizza = 8 slices Total number of slices = slices 4 x 8 = 32 slices Next, we need to divide the total number of slices by the number of people to find out how many slices each person will get: Number of people = 6 persons Number of slices per person = Total number of slices / Number of people Number of slices per person = 32/6 = 5 slices.

Have a useful question? Submit an MCQ