About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

5/2 - 4/2 = _____?

  • A3/2
  • B1/2
  • C1/3
  • DNone of these
Show answerHide answer

Correct answer B

The calculation is as follows: 5/2 - 4/2 = 1/2.

If the mean of 7 terms is 40, the sum of those terms will be?

  • A280
  • B480
  • C200
  • D346
Show answerHide answer

Correct answer A

The mean is calculated by dividing the sum of the terms by the number of terms. Mean = Sum of the terms/ Number of terms Given that the mean is 40 and there are 7 terms, we can find the sum as: 40 = The sum of the terms/7 Multiplying both sides by 7: Sum of the terms = 40 × 7 = 280.

Machine A can complete a job in 8 hours, and Machine B can complete the same job in 12 hours. If both machines work together, how many hours will they take to complete the job?

  • A6.4 hours
  • B6 hours
  • C5.6 hours
  • D4.8 hours
Show answerHide answer

Correct answer D

Machine A can complete the job in 8 hours, so its work rate is 1/8 of the job per hour. Machine B can complete the job in 12 hours, so its work rate is 1/12 of the job per hour. When they work together, their combined work rate is the sum of their individual work rates: (1/8 + 1/12) of the job per hour To add these fractions, we need a common denominator, which is 24. So we get: (3/24 + 2/24) = 5/24 of the job per hour Since they can complete 5/24 of the job in 1 hour, they can complete the entire job (1) in: 24/5 = 4.8 hours So, the correct answer is: 4.8 hours!