About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

If 15 men can be manufactured 27 basket in an hour how many baskets would 45 men manufactured in 40 minutes?

  • A27
  • B35
  • C40
  • D54
Show answerHide answer

Correct answer D

Given Data: 15 men can manufacture 27 baskets in 1 hour (60 minutes). We need to find how many baskets 45 men can manufacture in 40 minutes. Step 1: Baskets manufactured by 1 man in 1 minute In 1 hour (60 minutes), 15 men manufacture 27 baskets. Therefore, the number of baskets manufactured by 1 man in 1 minute is: 27 baskets/ 15 men × 60 minutes =2/ 900 = 0.03 baskets per man per minute. Step 2: Baskets manufactured by 45 men in 40 minutes If 1 man manufactures 0.03 baskets per minute, then 45 men will manufacture in 40 minutes: 45 × 40 × 0.03 = 54 baskets.

What would be the consequences for the OLS estimator heteroscedasticity is present in a regression model but ignored?

  • AIt will be ignored
  • BIt will be inconsistent
  • CIt will be inefficient
  • DAll of A, B and C will be true
Show answerHide answer

Correct answer C

If heteroscedasticity is present in a regression model but ignored, the Ordinary Least Squares (OLS) estimator will still be unbiased, but it will not be efficient. This means that the estimator will not have the smallest possible variance, and the estimates may not be precise.

Have a useful question? Submit an MCQ