What is the result of 3 + 3 × 3?
Show answer
Correct answer C
To solve 3 + 3 × 3, follow the order of operations (PEMDAS/BODMAS): Perform the multiplication first: 3 × 3= 9. Then add: 3 + 9 =12. So, the result is 12.
Learn Smarter. Achieve More.
Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.
Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.
Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.
7247 matching questions
Correct answer C
To solve 3 + 3 × 3, follow the order of operations (PEMDAS/BODMAS): Perform the multiplication first: 3 × 3= 9. Then add: 3 + 9 =12. So, the result is 12.
Correct answer B
Given equations: p + 2q = 14. (1) 3p + q = 12. (2) Multiply (2) by 2: 6p + 2q = 24. (3) Subtract (1) from (3): (6p - p) + (2q - 2q) = 24 - 14 5p = 10 p = 2.
Correct answer B
If 20 men can complete a work in 5 days, it means that the total work can be represented as: Total Work = 20 men × 5 days Total Work = 20 men × 5 days Now, if we want to find out how many days it will take for 10 men to complete the same work, we can set up the equation like this: Total Work = 10 men × number of days (we want to find) Total Work = 10 men × number of days (we want to find) Since the total work remains the same in both cases, we can equate the two expressions: 20 men × 5 days = 10 men × number of days 20 men × 5 days = 10 men × number of days 20 × 5 = 10 × number of days 20 × 5 = 10 × number of days 100 = 10 × number of days 100 = 10 × number of days Divide both sides by 10: Number of days = 100 10 = 10 days Number of days = 10 100 = 10 days So, 10 men would take 10 days to complete the work.
Correct answer C
The price of the stamp (Rs. 3) is irrelevant to the question. A dozen always contains 12 items.
Correct answer C
Given: 1. Sum of roots: α + β = 2 2. Sum of cubes of roots: α³ + β³ = 98 Step-by-Step Solution Step 1: Use the identity for α³ + β³ α³ + β³ = (α + β)³ - 3αβ(α + β) Step 2: Substitute known values 98 = (2)³ - 3αβ(2) 98 = 8 - 6αβ Step 3: Solve for αβ 98 - 8 = -6αβ 90 = -6αβ αβ = -15 Step 4: Form the quadratic equation x² - (α + β)x + αβ = 0 x² - 2x - 15 = 0 The answer is x² - 2x - 15 = 0.
Correct answer D
Let's evaluate the equation: (1/4 + 5/8) = 2/8 + 5/8 = 7/8 (1/2 + 3/4) = 4/8 + 6/8 = 10/8 = 5/4 Add the two expressions: (7/8) + (5/4) = 7/8 + 10/8 = 17/8 So, the equation evaluates to 17/8. Therefore, the correct answer is 17/8.
Correct answer C
Pattern: Each letter is replaced by its position in the alphabet, then joined. A=1, B=2, C=3, D=4, G=7, O=15, T=20 Check: CAT → C=3, A=1, T=20 → 3120 ✓ DOG → D=4, O=15, G=7 → 4157 ✓ So BAT: B=2, A=1, T=20 → 2120.
Correct answer C
1 year = 365 days (non-leap) Seconds in 1 year = 365 × 24 × 60 × 60 = 31,536,000 For 2 years = 31,536,000 × 2 = 63,072,000.
Correct answer A
Maryam = x Bilal = x - 3 (because Maryam has 3 more than Bilal) Jameel = x + 5 (because Maryam has 5 less than Jameel) Jameel + Bilal = (x + 5) + (x - 3) = 2x + 2.
Correct answer B
A linear equation is an equation involving two variables, Typically in the form Ax + By = C, where x and y are the variables, and A, B, and Care constants.