About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

What is the result of 3 + 3 × 3?

  • A15
  • B18
  • C12
  • D9
Show answerHide answer

Correct answer C

To solve 3 + 3 × 3, follow the order of operations (PEMDAS/BODMAS): Perform the multiplication first: 3 × 3= 9. Then add: 3 + 9 =12. So, the result is 12.

If p + 2q = 14 and 3p + q = 12 then p = ____?

  • A6
  • B2
  • C3
  • DNone of these
Show answerHide answer

Correct answer B

Given equations: p + 2q = 14. (1) 3p + q = 12. (2) Multiply (2) by 2: 6p + 2q = 24. (3) Subtract (1) from (3): (6p - p) + (2q - 2q) = 24 - 14 5p = 10 p = 2.

20 men can do a work in 5 days. How many days will 10 men take to complete that work?

  • A36 days
  • B10 days
  • C12 days
  • D16 days
Show answerHide answer

Correct answer B

If 20 men can complete a work in 5 days, it means that the total work can be represented as: Total Work = 20 men × 5 days Total Work = 20 men × 5 days Now, if we want to find out how many days it will take for 10 men to complete the same work, we can set up the equation like this: Total Work = 10 men × number of days (we want to find) Total Work = 10 men × number of days (we want to find) Since the total work remains the same in both cases, we can equate the two expressions: 20 men × 5 days = 10 men × number of days 20 men × 5 days = 10 men × number of days 20 × 5 = 10 × number of days 20 × 5 = 10 × number of days 100 = 10 × number of days 100 = 10 × number of days Divide both sides by 10: Number of days = 100 10 = 10 days Number of days = 10 100 = 10 days So, 10 men would take 10 days to complete the work.

The sum of the roots of a quadratic equation is 2 and the sum of the cubes of the roots is 98. The equation is?

  • AX² - 4x + 15 = 0
  • BX² - 4x - 15 = 0
  • CX² - 2x - 15 = 0
  • DNone of these
Show answerHide answer

Correct answer C

Given: 1. Sum of roots: α + β = 2 2. Sum of cubes of roots: α³ + β³ = 98 Step-by-Step Solution Step 1: Use the identity for α³ + β³ α³ + β³ = (α + β)³ - 3αβ(α + β) Step 2: Substitute known values 98 = (2)³ - 3αβ(2) 98 = 8 - 6αβ Step 3: Solve for αβ 98 - 8 = -6αβ 90 = -6αβ αβ = -15 Step 4: Form the quadratic equation x² - (α + β)x + αβ = 0 x² - 2x - 15 = 0 The answer is x² - 2x - 15 = 0.

Solve the equation: (1/4+5/8) + (1/2+3/4)=?

  • A35/32
  • B10/7
  • C5/12
  • D17/8
Show answerHide answer

Correct answer D

Let's evaluate the equation: (1/4 + 5/8) = 2/8 + 5/8 = 7/8 (1/2 + 3/4) = 4/8 + 6/8 = 10/8 = 5/4 Add the two expressions: (7/8) + (5/4) = 7/8 + 10/8 = 17/8 So, the equation evaluates to 17/8. Therefore, the correct answer is 17/8.

In a certain code, CAT = 3120, DOG 4157. What will BAT equal?

  • A3121
  • B2130
  • C2120
  • DNone of these
Show answerHide answer

Correct answer C

Pattern: Each letter is replaced by its position in the alphabet, then joined. A=1, B=2, C=3, D=4, G=7, O=15, T=20 Check: CAT → C=3, A=1, T=20 → 3120 ✓ DOG → D=4, O=15, G=7 → 4157 ✓ So BAT: B=2, A=1, T=20 → 2120.

Seconds in 2 non-leap years?

  • A63,153,600
  • B63,112,000
  • C63,072,000
  • DNone of these
Show answerHide answer

Correct answer C

1 year = 365 days (non-leap) Seconds in 1 year = 365 × 24 × 60 × 60 = 31,536,000 For 2 years = 31,536,000 × 2 = 63,072,000.

Have a useful question? Submit an MCQ