About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

The following correctly represents De Morgan's first law?

  • A(AUB)' = A'∩B'
  • B(A∩B)' = A'UB'
  • C(AUB) = A∩B
  • DNone of these
Show answerHide answer

Correct answer A

De Morgan's first law states that the complement of the union of two sets A and B is equal to the intersection of their complements. The correct representation is: (AUB)' = A' ∩ B'.

The value of log16^√2 = _____?

  • A1/8
  • B8
  • C4
  • DNone of these
Show answerHide answer

Correct answer A

The calculation is: log₂₄ 2^(1/2) = (1/2) / 4 = 1/8 Using the base-change identity: logₐₙ aᵐ = m/n Here, a = 2, m = 1/2, and n = 4: log₂₄ 2^(1/2) = (1/2) / 4 = 1/8.

³√32768 = ____?

  • A32
  • B24
  • C36
  • DNone of these
Show answerHide answer

Correct answer A

Calculate the cube root of 32768. ³√32768 = ³√32³ = 32.

What type of fraction is 5/8?

  • AImproper
  • BMixed
  • CProper
  • DNone of these
Show answerHide answer

Correct answer C

A proper fraction is a fraction where the numerator is less than the denominator. In 5/8, 5 < 8, so it is a proper fraction.

If means book, what does GNOC mean ________?

  • AHouse
  • BHand
  • CHorse
  • DHero
Show answerHide answer

Correct answer B

A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P, Q, R, S, T, U, V, W, X, Y, Z. ANPL BOOK the next alphabet of A is B, N is O, the before alphabet of P is O, K is L so GZOE HAND the next alphabet of G is H, Z is A the before alphabet of N is O, D is E.

Which of the following is a tautology?

  • AP∧∼p
  • BP∨∼p
  • C∼(p∨p)
  • DP∧q
Show answerHide answer

Correct answer B

The expression p ∨ ¬p (read as "p or not p") is a tautology. A tautology is a logical statement that is always true regardless of the truth value of its components. p ∨ ¬p is always true because either p is true or ¬p (not p) is true.

A is 4 times as fast as B and therefore is able to finish the work in 45 days less than B. A and B, can complete the work in how many days?

  • A15 days
  • B12 days
  • C18 days
  • DNone of these
Show answerHide answer

Correct answer B

A is 4 times as fast as B, so A's rate of work is 4 times B's rate of work. Since A finishes the work in 45 days less than B, let's assume B takes x days to finish the work. Then A takes x - 45 days to finish the work. Since A is 4 times as fast as B, A's rate of work is 4 times B's rate of work. So, A's time to finish the work is 1/4 of B's time. We can set up an equation based on the above: x - 45 = (1/4)x Solve for x: x - 45 = (1/4)x --> 4x - 180 = x --> 3x = 180 --> x = 60 So B takes 60 days to finish the work, and A takes 60 - 45 = 15 days to finish the work. Since A and B work together, their combined rate of work is the sum of their individual rates. Let's find their individual rates. B's rate = 1/60 (work done per day) A's rate = 1/15 (work done per day) Combined rate = (1/60 + 1/15) = (1/60 + 4/60) = 5/60 = 1/12 So A and B together can complete the work in 12 days.

Have a useful question? Submit an MCQ