About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

If 15 toys Rs. 234, what to 35 toys cost?

  • ARs. 526
  • BRs. 556
  • CRs. 536
  • DRs. 546
Show answerHide answer

Correct answer D

Cost of 15 toys = Rs. 234 Cost of 1 toy = Rs. 234 ÷ 15 = Rs. 15.60 Cost of 35 toys = Rs. 15.60 x 35 = Rs. 546 So, the correct answer is: Rs. 546.

The coefficient of variation (CV) is the ratio of _____?

  • AMean and Median
  • BVariance and Mean
  • CStandard derivation and Mean
  • DNone of these
Show answerHide answer

Correct answer C

The coefficient of variation (CV) is the ratio of Standard deviation and Mean. CV = (σ / μ) × 100, where σ is the standard deviation and μ is the mean.

X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone, and then after 4 days, Y joined him until the completion of the work. How long did the work last?

  • A10 days
  • B6 days
  • C15 days
  • DNone of these
Show answerHide answer

Correct answer A

X can do the work in 20 days, so X's work rate is 1/20 of the work per day. Y can do the work in 12 days, so Y's work rate is 1/12 of the work per day. X works alone for 4 days, completing 4/20 = 1/5 of the work. Y joins X, and together they complete the remaining 4/5 of the work. Their combined work rate is (1/20 + 1/12) = 8/60 = 2/15 of the work per day. Since they complete 4/5 of the work together, it takes them (4/5) / (2/15) = 6 days to complete the remaining work. Adding the 4 days X worked alone, the total duration is 4 + 6 = 10 days. So, the correct answer is: 10 days.

What is the ratio of 12 minute to 1 hour:?

  • A1:6
  • B1:12
  • C1:5
  • D1:9
Show answerHide answer

Correct answer C

To find the ratio of 12 minutes to 1 hour, we first convert 1 hour into minutes: 1 hour = 60 minutes. Now, the ratio of 12 minutes to 60 minutes is: 12 / 60 = 1/ 5.

Have a useful question? Submit an MCQ