About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

What is 15% of 65400?

  • A9710
  • B9810
  • C9610
  • D96100
Show answerHide answer

Correct answer B

To find 15% of 65,400: 15/100 × 65400 = 0.15 × 65400 = 9,810.

12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job, and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it is to be completed in 3 days?

  • A15
  • B19
  • C23
  • DData inadequate
Show answerHide answer

Correct answer A

Work done by 12 men in 4 days = 1 (full work) Work done by 1 man in 4 days = 1/12 Work done by 6 men in 4 days = 6/12 = 1/2 (i.e., half of the work) Work done by 6 men in 2 days = (1/2) × (2/4) = 1/4 Remaining work = 1 - 1/4 = 3/4 15 women complete the full work in 4 days → 1 woman’s 1-day work = 1/(15 × 4) = 1/60 Work needed in 3 days → x women × 3 × (1/60) = 3/4 x = (3/4) × (60/3) = 15 women.

The correct order for operation in BODMAS order?

  • ABrackets, Order, Multiplication, Division, Addition, Subtraction
  • BBrackets, Order, Division, Multiplication, Addition, Subtraction
  • CAddition, Multiplication, Division, Brackets, Subtraction, Order
  • DNone of these
Show answerHide answer

Correct answer B

The correct order of precedence using the 'rules' of BODMAS BODMAS stands for: Brackets, Orders (powers/roots), Division, Multiplication, Addition, Subtraction.

The sum of the reciprocals of A’s ages (in years) 2 years ago and 2 years from now is. The present age of A is?

  • A4 years
  • B5 years
  • C7 years
  • DNone of these
Show answerHide answer

Correct answer A

Calculation: Let, the present age of A = A 2 years ago, his age = A - 2 2 years from now, his age = A + 2 According to the question, ⇒ = 1/A - 2 + 1/A + 2 = 2/3 ⇒ 3(A + 2 + A - 2) = 2(A + 2)(A - 2) ⇒ 6A = 2(A2 - 22) ⇒ A2 - 3A - 4 = 0 ⇒ A2 + A - 4A - 4 = 0 ⇒ A(A + 1) - 4(A + 1) = 0 ⇒ (A - 4)(A + 1) = 0 ⇒ A = 4 or -1 Since, age can't be negative A = 4 ∴ The present age of A is 4 years.

What name is given to a 7-sided shape?

  • AHexagon
  • BOctagon
  • CHeptagon
  • DTriangle
Show answerHide answer

Correct answer C

A heptagon is a polygon that has seven sides. It is a closed figure having 7 vertices. A heptagon is also sometimes called Septagon. while Triangle (3-sided polygon) Quadrilateral ( 4-sided polygon) Pentagon ( 5-sided polygon) Hexagon (6-sided polygon) Heptagon ( 7-sided polygon) Octagon ( 8 sided polygon).

What percent of 4 is 5?

  • A125%
  • B100%
  • C80%
  • D50%
Show answerHide answer

Correct answer A

To find the percentage, divide 5 by 4 and multiply by 100: ( 5 ÷ 4 ) × 100 = 125%.

Have a useful question? Submit an MCQ