Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

What comes next in the series: S, P, N, M...?

  • AJ
  • BL
  • CK
  • DO
Show answerHide answer

Correct answer B

The sequence goes: S → P → N → M →? Now check the position in the alphabet: - S (19) - P (16) → -3 - N (14) → -2 - M (13) → -1 - Next: 13 - 1 = 12, which is L.

What is the Parameter of square which having 25m^2 area??

  • A5
  • B10
  • C15
  • D20
Show answerHide answer

Correct answer D

To find the perimeter of a square with area = 25 m²: Step 1: Find the side length. Area of square = side² ⇒ side = √25 = 5 meters Step 2: Find the perimeter. Perimeter of square = 4 × side = 4 × 5 = 20 meters.

A man earned Rs. 5000 for his first 40 hours of work in a week and is then pain double of his regular hourly rate. He earned Rs. 6000 in a week. How many hours he worked in that week?

  • A45
  • B44
  • C47
  • DNone of these
Show answerHide answer

Correct answer B

Man earned Rs. 5000 for 40 hours. Regular hourly rate = 5000 / 40 = Rs. 125 Overtime rate = double = 2 x 125 = Rs. 250 Total earned = Rs. 6000 Overtime pay = 6000 - 5000 = Rs. 1000 Overtime hours = 1000 / 250 = 4 hours Total hours = 40 + 4 = 44 hours.

Log base is ___________?

  • A20
  • B10
  • C21
  • D30
Show answerHide answer

Correct answer B

The logarithm base 10 is called the decimal or common logarithm commonly used in science and engineering.