About Mathematics

Mathematics MCQs for recruitment exams often ask you to apply familiar ideas quickly: percentages, ratios, averages, fractions, algebra, geometry, and word problems. Begin by deciding what the question is asking you to find, then write down the quantities and units. Before choosing an answer, check the direction and approximate size of the result. A quick estimate can catch a misplaced decimal or a reversed ratio.

Learn each method through problems with different wording. A percentage increase depends on the original value, while a percentage decrease may use a different starting point. In a work-rate problem, two people completing a task together contribute rates rather than adding their completion times. Small comparisons like these are more useful than memorising an isolated formula.

Start with short, untimed sets. After each error, mark whether you misunderstood the question, chose the wrong operation, or made an arithmetic slip. Then redo the problem without looking at the solution. As you build accuracy, switch to timed mixed sets and practise leaving a lengthy question for later. Review the syllabus for your post so your practice includes the methods and difficulty level you are likely to see.

Browse sections
All MCQs All Mathematics questions

Mathematics Questions

Clear filters

7247 matching questions

15 men take 21 days of 8 hours each to do a piece of work. How many days of 6 hours each would take 21 women if 3 women do as much work as 2 men, keeping the hours constant?

  • A30
  • B19
  • C20
  • DNone of these
Show answerHide answer

Correct answer A

Given that 3 women = 2 men in terms of work: Work done by 15 men in 1 hour = 1 / (21 * 8) Work done by 1 man in 1 hour = 1 / (15 * 21 * 8) Work done by 1 woman in 1 hour = (2/3) * (1 / (15 * 21 * 8)) Work done by 21 women in 1 hour = 21 * (2/3) * (1 / (15 * 21 * 8)) = 14 / (15 * 21 * 8) = 1 / (15 * 9 * 8) (simplified for 21 women working) If 21 women work for 6 hours a day: Work done by 21 women in 1 day = 6 * (1 / (15 * 9 * 8)) * (15 * 9) = 6 / 8 To complete the work: Number of days = 8 / 6 * 21 = 28 None of the given options directly match the calculation approach provided, but recalculating properly considering the work equivalence and hours: 15 men * 21 days * 8 hours = 2520 man-hours Given 3 women = 2 men, 21 women = 14 men equivalent Let x be the number of days for 21 women working 6 hours/day: 14 men * x days * 6 hours = 2520 man-hours 84x = 2520 x = 30.

1 + 1 + 2 + 3 ÷ 3 × 0 = ____?

  • A4
  • B14
  • C10
  • D13
Show answerHide answer

Correct answer A

To evaluate this expression, we need to follow the order of operations (PEMDAS): Divide 3 by 3: 3 ÷ 3 = 1 Multiply 1 by 0: 1 × 0 = 0 Add the numbers: 1 + 1 + 2 + 0 = 4 So, the correct answer is: 4.

What will come next 16 12 28 8 4 ________?

  • A10
  • B12
  • C13
  • DNone of these
Show answerHide answer

Correct answer B

16+12 = 28 Sequence is now: 16,12,28 Take the next two terms of the arithmetic sequence S, 8 and 4 8 + 4 = 12 A sequence is now: 16,12,28,8,4, 12.

If m + n = 5 and 2m + 3n = 15, then m - n = _____?

  • A-8
  • B20
  • C-5
  • DNone of these
Show answerHide answer

Correct answer C

Given equations: m + n = 5. (1) 2m + 3n = 15. (2) Multiplying equation (1) by 2: 2m + 2n = 10. (3) Subtracting equation (3) from equation (2): (2m + 3n) - (2m + 2n) = 15 - 10 n = 5 Substituting n = 5 in equation (1): m + 5 = 5 m = 0 Now, m - n = 0 - 5 = -5.

Have a useful question? Submit an MCQ