The costs that are planned in future and has not been incurred are known as ___________?

  • ADesigned-in costs
  • BLocked-in costs
  • CValue added cost
  • DBoth a and b
Show answerHide answer

Correct answer A

In accounting terminology and practice, the costs that are planned in future and has not been incurred are known as Designed-in costs.