If the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minute, then the value added manufacturing time will be _________?
Show answer
Correct answer C
In accounting terminology and practice, if the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minute, then the value added manufacturing time will be 32.625.