The ratio of the mass of sand to cement in a particular type of concrete is 4.8: 2. If 6 kg of sand are used, how much cement is needed?

  • A3.5 kg
  • B3 kg
  • C2.5 kg
  • DNone of these
Show answerHide answer

Correct answer C

Given ratio: Sand: Cement = 4.8: 2 Let's find the factor by which 4.8 is multiplied to get 6 kg of sand: 6 kg / 4.8 = 1.25 Now, multiply the cement ratio by this factor: Cement needed = 2 × 1.25 = 2.5 kg.