If six people dig a well 200m deep in 15 days, the number of people that are required to dig the same well in 18 days is _____?

  • A15
  • B5
  • C10
  • DNone of these
Show answerHide answer

Correct answer B

6 people dig a 200m well in 15 days. To find the total work done in terms of "man-days": 6 people × 15 days = 90 man-days Now, let's find the number of people required to dig the same well in 18 days: Let x be the number of people required. x people × 18 days = 90 man-days x = 90 / 18 x = 5.