If 6 men can make 10 sofas in 2 days, then 8 men can make 8 sofas in ______?
Show answer
Correct answer C
Given: - 6 men make 10 sofas in 2 days. First, find the total man-days needed for 10 sofas: 6 men × 2 days = 12 man-days for 10 sofas. So, man-days per sofa = 12 ÷ 10 = 1.2 man-days per sofa. Now, for 8 sofas: Total man-days needed = 8 sofas × 1.2 = 9.6 man-days. If 8 men are working, number of days needed = 9.6 ÷ 8 = 1.2 days.