Twenty-four men can complete a work in sixteen days. Thirty-two women can complete the same work in twenty-four days. Sixteen men and sixteen women started working and worked for twelve days. How many more men are to be added to complete the remaining work in 2 days?

  • A18 men
  • B24 men
  • C36 men
  • D50 men
Show answerHide answer

Correct answer C

We are given: 24 men complete the work in 16 days → 1 man's 1-day work = 1/24×16=1/384 32 women complete the work in 24 days → 1 woman's 1-day work = 1/32×24=1/768 16 men and 16 women work for 12 days Step 1: Work done by 16 men and 16 women in 12 days Work done by 16 men in 1 day = 16×1/384=16/384=1/24 Work done by 16 women in 1 day = 16×1/768=16/768=1/48 Total work done in 1 day = 1/24+1/48=2/48+1/48=3/48=1/16 Total work done in 12 days = 12×1/16=12/16=¾ Step 2: Work remaining Total work = 1 Work done = ¾ Work remaining = 1−3/4=1/4 Step 3: Additional men required The remaining work must be completed in 2 days. Let x be the number of additional men needed. Work done by (16 + x) men in 1 day = (16+x)×1384(16 + x) Work done in 2 days = 2×(16+x)×1384=142 Solving for x: (16+x)×2/384=¼ 16+x=1/4×384/2=384/8=48 x=48−16=32 The closest option is 36 men.