12 men water the field in 9 hours. How many men will be required to water the same field in 4 hours?

  • A27 men
  • B26 men
  • C25 men
  • DNone of these
Show answerHide answer

Correct answer A

Given that 12 men can water the field in 9 hours, we can calculate the total man-hours required: Total man-hours = 12 men * 9 hours = 108 man-hours If the same field needs to be watered in 4 hours, let's denote the number of men required as x: x men * 4 hours = 108 man-hours x = 108 / 4 x = 27.