Prime Minister Imran inaugurated Peshawar Bus Rapid Transit (BRT) on ______?

  • AAugust 7, 2020
  • BAugust 13, 2020
  • CAugust 12, 2020
  • DAugust 16, 2020
Show answerHide answer

Correct answer B

The BRT project started in October 2017. Built at a cost of Rs 70 billion. It features a 27.5 kilometre-long corridor track. Includes 31 stations along the main route. Has 7 feeder routes stretching 62 km. These feeder routes include 146 stops. The system is designed to facilitate thousands of passengers daily.