Which motorways are ready to be used as runways in any emergency?

  • AM1 and M2
  • BM1 M2 and M3
  • CM3 and M4
  • DM2
Show answerHide answer

Correct answer A

M1 and M2 motorways are ready to be used as runways in any emergency. All motorways in Pakistan are prefixed with the letter 'M' (for "Motorway") There are a total of 16 motorways There are a total of 11 of which are operational, while some are under construction and others are planned. List of motorways Name Route Length (km) Lanes Completion Year Status Remarks M-1 Motorway Peshawar – Islamabad 155 6 2007 Operational M-2 Motorway Islamabad – Lahore 367 6 1997 Operational Repaved in 2016 M-3 Motorway Lahore – Abdul Hakeem 230 6 2019 Operational Construction began in December 2015. M-4 Motorway Pindi Bhattian – Multan 309 4-6 2019 Operational Construction began in 2009. M-5 Motorway Multan – Sukkur 392 6 2019 Operational Construction began in May 2016. M-6 Motorway Sukkur - Hyderabad 306 6 2024 Under Construction Ground breaking done on 13 December 2022 M-7 Motorway Dadu – Hub 270 N/A N/A Planned M-8 Motorway Ratodero – Gwadar 892 2 2022 Partially Operational Under Construction M-9 Motorway Hyderabad – Karachi 136 6 2018 Operational Upgradation planned into 8 lanes. M-10 Motorway Karachi Northern Bypass 57 2 2007 Operational Proposed for expansion into 4 lane. M-11 Motorway Lahore – Sialkot 103 4 2020 Operational Construction started in 2018 M-12 Motorway Sialkot – Kharian 69 4 2024 Under Construction Construction started in September 2021 M-13 Motorway Kharian - Rawalpindi 117 4 2024 Under Construction M-14 Motorway Islamabad – D.I Khan 285 4 2022 Operational Construction began in May 2016. M-15 Motorway Hasan Abdal – Thakot 180 6-4-2 2020 Operational Also called Hazara Motorway. Construction began in 2016 M-16 Motorway Swabi – Chakdara 160 4 2020 Operational Also called Swat Motorway. Phase 1 operational in October 2020. Phase 2 construction started in May 2022 & will be completed in February 2024. Total Length.