Neelum–Jhelum Hydroelectric Power Project is located in which district?
Show answer
Correct answer C
The power station is located 42 km (26 mi) south of Muzaffarabad, It has an installed capacity of 969 MW Designed to divert water from the Neelum River to a power station on the Jhelum River. HISTORY O n 7 July 2007, the China consortium, comprising CGGC-CMEC (Gezhouba Group and China National Machinery Import and Export Corporation), was awarded a contract to construct the dam and power station. Construction began in 2008 Opening date 14 August 2018 Height 60 m (197 ft) Length 125 m (410 ft).